GENERATION AND COST OF THE MEGAWATTS USING ECONOMETRICS
Keywords:
regression, correlation, computer system, electric power generation.Abstract
This work was conducted at the Energy Plant "Antonio Maceo" (Renté), in the province of Santiago de Cuba, under the Ministry of Energy and Mining. Aims to study the improvement of the planning process and as field of action the econometric modeling applied to the production of electricity. The overall objective of this research is to develop estimates of electricity generation and its total costs, and the analysis of the influence of production factors, using econometric techniques. In order to fulfill the above objective was used and perfected the "Information System for the Calculation of Production Estimates" (SICEP), which determines the response functions, considering the main factors influencing the electricity generation and its total costs. The results allow to show that the most influential factor in the generation of electricity is the fuel, it appreciated by analyzing the standardized b coefficient that reflects the highest value (0,39). Furthermore, the most influential factor in the total cost of generation is the additive, which shows a coefficient b standardized 0,51. The estimates given show the standard error values almost coincide with the standard deviation obtained in the reporting of error normality. The results will be useful to the process of production planning and securing materials from it.Downloads
Published
Issue
Section
License
Esta revista proporciona un acceso abierto inmediato a su contenido, basado en el principio de que ofrecer al público un acceso libre a las investigaciones ayuda a un mayor intercambio global de conocimiento.
This journal provides immediate open access to its content, based on the principle that providing the public with free access to research supports a greater global exchange of knowledge.